What Is a Change Order?

Any signed amendment that alters the scope, price, or schedule of an existing solar contract is a change order. Typical triggers include electrical upgrades found at the site survey, roof repairs, added panels or batteries, and equipment substitutions. It needs the homeowner’s signature before the extra work proceeds.

Pay only for booked appointments. No retainer.

Any signed amendment that alters the scope, price, or schedule of an existing solar contract is a change order. Typical triggers include electrical upgrades found at the site survey, roof repairs, added panels or batteries, and equipment substitutions. It needs the homeowner’s signature before the extra work proceeds.

Change Order explained

The change order states what is changing, why, the effect on price, and any shift in timeline, and both parties sign. If financing is involved, the lender or lease provider may need to re-underwrite, and a larger amount can mean a new approval. Rules on updated disclosures for amended terms vary, so the installer’s compliance team owns that step.

Change orders show up most after the site survey, when physical reality overrides the proposal. A main panel that cannot handle the load, trenching that costs more than estimated, or a roof that needs work first will each generate one. Reps dislike them because commission can change; homeowners dislike them because they feel like a bait-and-switch when the issue was foreseeable.

Prevention starts at the appointment: ask about the age of the roof and the main panel, mention that the site survey can change scope, and avoid describing the quote as final. Mistakes include starting work on a verbal okay, burying the change in a long document, or pressuring the homeowner right before a crew date. Unsigned changes become disputes, and disputes become cancellations, reviews, and complaints that outlast the job.

Why it matters when you're buying

Frequent change orders mean proposals were built on assumptions. Gathering roof and panel information at the appointment, and saying plainly that a survey may adjust scope, hands the project team cleaner jobs and the homeowner fewer unpleasant surprises, which keeps more signed deals alive.

Frequently Asked Questions

Do I have to sign a solar change order?
You are not obligated to accept new terms, but the installer is also not obligated to perform work outside the original scope at the original price. If a change is needed, review it, ask questions, and decide before any work proceeds.
What causes change orders in solar projects?
The usual causes are findings from the site survey, such as an undersized main panel, needed roof repairs, shade or structural limits, plus homeowner requests to add panels or a battery and equipment substitutions when a model is unavailable.
Can a solar company raise the price after I sign?
Only through an agreed amendment or under a contract clause that allows adjustments, and what is allowed depends on the contract and state law. Unexpected site conditions are the usual reason. Read the pricing and scope language before signing and get any change in writing.

Put the playbook to work

VA Horizon books qualified Solar appointments and builds the systems behind Change Order and the rest of your pipeline.

Book a Solar Call

Pricing set on a 15-minute call · Pay per booked appointment · No-shows replaced free