What Is Pull-Through Rate?
Where close rate stops at the signature, pull-through rate follows the contract to the finish line: it is the share of signed deals that actually become installed, operating systems. Stalled projects, cancellations, and financing failures all pull the number down.
Pay only for booked appointments. No retainer.
Where close rate stops at the signature, pull-through rate follows the contract to the finish line: it is the share of signed deals that actually become installed, operating systems. Stalled projects, cancellations, and financing failures all pull the number down.
Pull-Through Rate explained
Companies calculate it by cohort, dividing the contracts that reached a defined endpoint, commonly installation complete or permission to operate, by the contracts signed in that period. Some compare sold watts with installed watts instead of counting contracts, which reduces the distortion from small jobs. Because installs take months, recent cohorts always look worse than they will eventually end up.
Financiers and sales managers watch it because it converts signatures into revenue. A team with a strong close rate and weak pull-through is manufacturing contracts that never become projects, and everyone downstream, from design to permitting to the crews, pays for that. Owners buying appointments should judge a source by installed systems per sat appointment, not by signatures alone. Crew scheduling and material orders ride on this number too.
Cautions: cancellation rate and pull-through rate are related but not identical, since a deal can be stuck, on hold, or abandoned without formally cancelling. Endpoints must match when comparing, and cohort timing matters. A utility backlog, a supply delay, or a paused rebate program can drag rates down without any fault of the sales team, so read the rate alongside the stage where deals are stalling.
Why it matters when you're buying
Signatures are not revenue; installed systems are. Owners who track pull-through spot weak lead sources, overpromising closers, and process choke points months before the cash shows it. Judge any appointment source, VA Horizon included, by installed systems per sat appointment, not by how many contracts get signed.
Frequently Asked Questions
What is the difference between close rate and pull-through rate?
How do you calculate pull-through rate in solar?
Why is my solar pull-through rate low?
Put the playbook to work
VA Horizon books qualified Solar appointments and builds the systems behind Pull-Through Rate and the rest of your pipeline.
Book a Solar CallPricing set on a 15-minute call · Pay per booked appointment · No-shows replaced free
Recommended next steps
